Lifestyle

Pavement project in Valley Forge Park starts on October 25

The Pennsylvania Department of Transportation (PennDOT) is a project to restore the Galfrode block pavement in the Valley Forge National Historical Park in Montgomery County Upper Melion Township and Chester County Tolediflin Township, which will be built on Monday, October 25. Announced that it will start.

Due to the nature of the construction, from Monday 25th October, Galfrod will be closed, bypassing the outer line drive and Thomas Road within the boundaries of the park. During the closure period, Gulph Road drivers will be instructed to use Route 23 (Valley Forge Park Road), North Gulph Road, and Richards Road. The road closure is valid until May 2022.

Drivers are advised to take extra time when navigating the work area, as backups and delays can occur. All scheduled activities depend on the weather.

In this project, a Pennsylvania contractor will repair a degraded granite block of approximately 180 straight feet in Galfrode in front of the National Memorial Arch, while preserving the historical importance of the road and providing a comfortable ride for the general public. To improve.

Improvement projects include removing and reusing existing granite blocks and curbs as much as possible. Damaged blocks and curbs are replaced with new “real” curbs and granite blocks of the same dimensions. Contractors also utilize the original materials stored at the National Park Service (NPS), such as curbs, granite blocks and bollards.

Granite block pavement was first installed around 1921 after the construction of the National Memorial Arch in 1914, with several pavement renovations in 1997. In addition, this project does not change the characteristics of the Valley Forge National Historical Park. List of National Register of Historic Places. All pavement restorations will be constructed in accordance with the Secretary of the Interior’s standards for the handling of historic property.

Marino Corporation of Skippack Township, Montgomery County, is a general contractor for the $ 689,496 project, 100% state-funded and scheduled to end in the summer of 2022.

Pavement project in Valley Forge Park starts on October 25

Source link Pavement project in Valley Forge Park starts on October 25

Related Articles

Back to top button